Cherry Pick
Hard
In a N x Ngrid
representing a field of cherries, each cell is one of three possible integers.
0 means the cell is empty, so you can pass through;
1 means the cell contains a cherry, that you can pick up and pass through;
-1 means the cell contains a thorn that blocks your way.
Your task is to collect maximum number of cherries possible by following the rules below:
Starting at the position (0, 0) and reaching (N-1, N-1) by moving right or down through valid path cells (cells with value 0 or 1);
After reaching (N-1, N-1), returning to (0, 0) by moving left or up through valid path cells;
When passing through a path cell containing a cherry, you pick it up and the cell becomes an empty cell (0);
If there is no valid path between (0, 0) and (N-1, N-1), then no cherries can be collected.
Example 1:
Note:
grid
is anN
byN
2D array, with1<= N <= 50
.Each
grid[i][j]
is an integer in the set{-1, 0, 1}
.It is guaranteed that grid[0][0] and grid[N-1][N-1] are not -1.
Solution
Dynamic Programming - Memoization Search - Top Down
intuition
Instead of walking from end to beginning, let's reverse the second leg of the path, so we are only considering two paths from the beginning to the end.
Notice aftert
steps, each position(r, c)
we could be, is on the liner + c = t
. So if we have two people at positions(r1, c1)
and(r2, c2)
, thenr2 = r1 + c1 - c2
. That means the variablesr1, c1, c2
uniquely determine 2 people who have walked the samer1 + c1
number of steps. This sets us up for dynamic programming quite nicely.
algorithm
Letdp[r1][c1][c2]
be the most number of cherries obtained by two people starting at(r1, c1)
and(r2, c2)
and walking towards(N-1, N-1)
picking up cherries, wherer2 = r1+c1-c2
.
Ifgrid[r1][c1]
andgrid[r2][c2]
are not thorns, then the value ofdp[r1][c1][c2]
is(grid[r1][c1] + grid[r2][c2])
, plus the maximum ofdp[r1+1][c1][c2]
,dp[r1][c1+1][c2]
,dp[r1+1][c1][c2+1]
,dp[r1][c1+1][c2+1]
as appropriate. We should also be careful to not double count in case(r1, c1) == (r2, c2)
.
Why did we say it was the maximum ofdp[r+1][c1][c2]
etc.? It corresponds to the 4 possibilities for person 1 and 2 moving down and right:
Person 1 down and person 2 down:
dp[r1+1][c1][c2]
;
Person 1 right and person 2 down:
dp[r1][c1+1][c2]
;
Person 1 down and person 2 right:
dp[r1+1][c1][c2+1]
;
Person 1 right and person 2 right:
dp[r1][c1+1][c2+1]
;
Complexity Analysis
Time Complexity:O(N^3), whereNNis the length of
grid
. Our dynamic programming has O(N^3) states.Space Complexity:O(N^3), the size of
memo
.
Last updated